Dhaka
Hatirjheel Integrated Project
302-acre lakefront development with 4 major bridges, overpasses, and 16 km of expressway. Built by Bangladesh Army (SWO). Stated cost: BDT 1,971 Crore.
Landmarks
A selection of infrastructure and commercial projects associated with RSRM in the supplied specification.
7 projects
Dhaka
302-acre lakefront development with 4 major bridges, overpasses, and 16 km of expressway. Built by Bangladesh Army (SWO). Stated cost: BDT 1,971 Crore.
Dhaka
1.8 km elevated transit route connecting Matikata to Airport Road. Stated cost: BDT 200 Crore.
Chattogram
950-meter river crossing with 4 high-speed lanes and dedicated low-speed lanes. Engineered by Major Bridge Engineering Co.
Chattogram
353-bed healthcare facility with 13 operation theaters and 94 consulting suites.
Dhaka
Hotel complex across 7 acres, with 204 suites and conference facilities.
Cox’s Bazar
Beachfront resort along the coastline of Cox’s Bazar.
Chattogram
2.1-acre waterfront venue with a 1,000+ seat ballroom, cottages, and resort facilities.
Project descriptions are supplied reference content. Images are illustrative and do not depict the named projects.
LET’S BUILD TOGETHER